Phase 2 began a few weeks ago. Got a late start because we had a baby in November. Started off by doing a leak down and compression test on the engine. It passed with flying colors so an engine rebuild is no longer in the plans. As far as the motor goes, I'm still gonna go ahead and swap out the 5 1/2 quart oil pan for a 10 quart pan. While I'm down there I'll probably replace the oil pump. I'm also thinking about maybe doing roller rockers and new valve springs. The exhaust logs were cracked at the flanges and way too restrictive so I got a set of Bassett OT headers and they are still at the chromers. When I removed the thru transom tips I discovered that the left tip was installed incorrectly and the wood on the inner part of the transom is in pretty bad shape from the tip leaking water. So instead of installing block off plates, I'm taking the boat down to Havasu on 02/19 to have the transom exhaust holes filled as well as the swimstep holes filled and the entire tansom gelcoated. The swimsteps were in pretty ruff shape and kinda cheap looking. I still haven't decided if I'm gonna put steps back on the boat or not. The boat came with a stereo which I never used even once. So I removed it, the amp, xm module and all associated wiring. While the boat is in Havasu I'll go ahead and have the radio hole in the dash filled in as well. I need to pull the gauges inorder to have the dash repaired so I went ahead and bought a new set of guages and angled bezels to give the boat a bit of a more updated look. Last time I took the boat out, the MSD box took a shit on me and left me stranded. So I went ahead and removed it along with the coil and all the wiring and I bought an HEI distributor. That's all for now. Here are a few pics.