My original plan was to use 4x3 reducers, and run with my original 3" hose, and jump up to hit the 4". but now that i have the tips installed, i dont have alot of room. So I am now going to run it in 4" hose, with somesort of sleeve over my 3" log exit, to make it 4" diameter