I'm about to start epoxying in my stringers with West Marine Epoxy and I would like to epoxy them into place and let them set and harden so they don't move around when I start reinforcing layers of fiberglass, Directions say if it sets during layering i just need to sand the new surface before reapplying a new started layer. I want to let it set before the first layer and I read and heard and remember from years ago that restarting can make bubbles from temperature differences caused from the heat when curing. So my question is.
Can I epoxy my stringers to the floor on all contact points only, using no covering material, flair the seams, Let dry/set/harden over night, Then the next day cover all the wood with all the layers of fiberglass woven roving, mat and cloth that i will be using? With Out any curing problems? Like cracks or bubbles or warping from heat changes?
And does anyone have a preferred method of layers, Looks like the factory put down woven roving first, then mat then cloth, I'm thinking Two layers of those 3 in that order??
Thanks for your time and information it is much appreciated. Roy