30
« on: November 10, 2007, 02:50:07 PM »
I spoke with Jack awhile back and he said the optimum place for the intake was about 2-3 inches further back. I was thinking of breaking the intake out so I could polish and powder coat it, the suction housing and the bowl all at one time. I figure, if I am breaking it out and doing that work I might as well reset it so its at its optimum place for what I ultimately wanna do with the boat.
I don't want to be getting spanked by Lil Rick and claim its cause I was an inch or two out of specs. LOL! Besides I figure I might as well make the POS look nice while I am at it.
Here is a question...
I was thinking of pretty much doing the "works" to the inside of my pump, polishing it removing all the rough edges, flowing the bowl, is or has any one hard anodized their pumps? I am just curious cause the money involved in the work, would it be good to protect that kind of investment. Seriuosly, all the money I will have in my pump will probably be labor aside from the initial cost of the "Factory" housing. This way my pump will stay with the CJ Rules.
Also, I noticed in Brads post about the APBA rules and a commitee on the rules and guidelines, this is something we should be doing ourselves. We should contact Ross over at APBA and have him set us up as this commitee since no one else is doing it. Maybe try and get someone from Berkley and American Turbine to chime in as well. Lets face it, they manufacture these parts and it can only be good for their business to be involved and give direct support to those that are willing to race with their parts.
I have contacts already with a few of these people in the industry and will run these ideas past them and see how they feel about contributing on knowledge and guidelines for some sort of standards here.
Oh yeah, I think your security guard was asleep at the door when I came in too... Cause the other websites about JetBoats won't let me in thats for sure.
Jason