eliminatethis
Jr. Member
Karma: +0/-0
Reactions:
Re: sleekcraft project
«
Reply #25 on:
December 03, 2011, 11:29:27 AM »
made a trim out plate to clean up the transom around the pump. just have to counter sink the hole then off to polish. Yeh I know it's large but I wanted to cover the recess around the pump.
Logged
eliminatethis
Jr. Member
Karma: +0/-0
Reactions:
Re: sleekcraft project
«
Reply #26 on:
December 03, 2011, 11:32:23 AM »
Also replaced the bunks on the trailer and used glide on covers inplace of carpet.
Logged
eliminatethis
Jr. Member
Karma: +0/-0
Reactions:
Re: sleekcraft project
«
Reply #27 on:
December 20, 2011, 01:41:44 PM »
1st piece of 1/8 plywood in after first installing epoxy resin and Episize Biaxiel Fabric to the back side. after 24 hours I filled the hollow areas with HI BOND closed cell pour foam, BOY it that stuff messy!
Logged
eliminatethis
Jr. Member
Karma: +0/-0
Reactions:
Re: sleekcraft project
«
Reply #28 on:
December 20, 2011, 01:46:36 PM »
second layer of epoxy resin and Episize Biaxiel Fabric done
Logged
eliminatethis
Jr. Member
Karma: +0/-0
Reactions:
Re: sleekcraft project
«
Reply #29 on:
April 03, 2012, 01:46:51 PM »
last layer of 1/8th inch ply W/hard wood vanier in and coated with one thincoat of west systems 207 speciel hardener and 105 resin. just to keep it looking like new till I can do the last layer of fiberglass bi-axial fabric and gas tank mounts.
Logged
propless
Macho Member
Karma: +12/-0
Reactions:
Re: sleekcraft project
«
Reply #30 on:
April 04, 2012, 02:08:30 AM »
This sure is coming out nice.
So you used 2 layers of 1/8" ply on the floor ? My junk project had 1/4" that I have to replace, and 2 layers of 1/8" sure sounds like a better idea. That way I could stagger the joints like you did and it should end up stronger. I haven't seen it done like that before, nice idea !
Logged
Quote from: 2savage4you on September 01, 2007, 07:33:42 PM
Welcome to the club of broken boats
Pay here$ bend over and move along.
82daytona
Informative Member
Karma: +7/-0
Reactions:
Re: sleekcraft project
«
Reply #31 on:
April 04, 2012, 06:33:55 AM »
I like the wood look a lot. Is it getting covered?
Logged
Echelon Tile and Stone
eliminatethis
Jr. Member
Karma: +0/-0
Reactions:
Re: sleekcraft project
«
Reply #32 on:
April 12, 2012, 02:47:09 PM »
I may not cover it, the wood does look great.
Logged
mobboss
Hero Member
Karma: +15/-0
Reactions:
Re: sleekcraft project
«
Reply #33 on:
April 12, 2012, 04:15:37 PM »
looks like a great job to me!
Logged
Boat #1: boat less
eliminatethis
Jr. Member
Karma: +0/-0
Reactions:
Re: sleekcraft project
«
Reply #34 on:
April 28, 2012, 07:57:34 AM »
Working on the SST is hard this weekend(Leesburg Bike Fest)
Logged
eliminatethis
Jr. Member
Karma: +0/-0
Reactions:
Re: sleekcraft project
«
Reply #35 on:
July 14, 2012, 11:36:39 AM »
both tanks in and both fuel pumps mounted & plumbed
Logged
eliminatethis
Jr. Member
Karma: +0/-0
Reactions:
Re: sleekcraft project
«
Reply #36 on:
July 21, 2012, 09:20:32 AM »
first set went almost perfect only two oil line fittings are to close to the tunnel so back to the Earls book for new fittings.
Logged
eliminatethis
Jr. Member
Karma: +0/-0
Reactions:
Re: sleekcraft project
«
Reply #37 on:
July 25, 2012, 03:49:15 PM »
Exposed mounting plates bolted down and epoxied with West Systems G-Flex
the unexposed bases are in the floor baried under 5 layers of Episize Biaxiel Fabric and three1/8th inch layers of ply. all with west systems epoxy.
Logged
PNW Marlin
Newbie
Karma: +0/-0
Reactions:
Re: sleekcraft project
«
Reply #38 on:
July 31, 2012, 05:42:12 AM »
very nice!
Logged
eliminatethis
Jr. Member
Karma: +0/-0
Reactions:
Re: sleekcraft project
«
Reply #39 on:
August 03, 2012, 09:17:42 AM »
Stuffer mounting plate installed into Dominator bowl. Six stainless set screws & .004 press.
Logged
eliminatethis
Jr. Member
Karma: +0/-0
Reactions:
Re: sleekcraft project
«
Reply #40 on:
August 03, 2012, 11:18:22 AM »
stuffer installed into dominator bowl
Logged
eliminatethis
Jr. Member
Karma: +0/-0
Reactions:
Re: sleekcraft project
«
Reply #41 on:
August 03, 2012, 02:09:55 PM »
Hi Tech perf. prime a jet installed
Logged
eliminatethis
Jr. Member
Karma: +0/-0
Reactions:
Re: sleekcraft project
«
Reply #42 on:
August 13, 2012, 09:32:12 AM »
Found the smoking gun! The owner of this SST before me blew his fresh engine the first day out. The owner before him Blew three engines. Both sold her out of anger. Well I found the reason they all blew. The SST had the original through the tunnel mounts and the original bell housing but the drive shaft was changed from the origanal the bolted direct to the crankshaft to the PTO adapter and drive shaft type. neither owners moved the mounts forward just jammed it together and with that preload and the load of the pump moving forward they kept eating rear mains. I glade I caught it. Here is a pic of the new bell housing and a pic of the offset to the mounts I had to make up
Logged
eliminatethis
Jr. Member
Karma: +0/-0
Reactions:
Re: sleekcraft project
«
Reply #43 on:
August 18, 2012, 08:39:03 AM »
Stainless headers in , had to use 3/4" manifold spacers to clear valve covers. 4" exaust holes cut now I gotta make it work.
Logged
eliminatethis
Jr. Member
Karma: +0/-0
Reactions:
Re: sleekcraft project
«
Reply #44 on:
August 24, 2012, 04:07:49 PM »
Got the 3/4 inch exhaust spacers in from CP perf. I had to mill clearances for the head studs and MSD spark plug boots.They are done and look good!
Logged
eliminatethis
Jr. Member
Karma: +0/-0
Reactions:
Re: sleekcraft project
«
Reply #45 on:
September 07, 2012, 07:45:37 AM »
Stainless Marine - custom elbows,
2 tight 90deg. and 2 tight 97deg. one leg tiped in 7 deg. more than the other leg.