The place diverter and bowl are painted and installed. They look like new

I have the pump in and plumbed. I had to order bolts for the loader so I'm waiting
on them.
I'm not putting the manifolds on till I get the nuts on the inside of the loader bolts.
I can't put the battery in to try the diverter till the logs are on, so we're in a holding pattern.
The boat should be ready to get wet sometime next week easily.
We go for the other CV-23 Friday and will be back with it Saturday.
We'll be installing the engine ASAP. It's going to be a busy week or so.
Oh and Tom, the old impeller was in a lot worse shape than I could feel from the clean out hole.
I'm glad I made the change.
Thank you again Tom for getting me fixed up.