Null


tunnels

  • Karma: +13/-0
Re: Sleekcraft SST Tunnel Project.
« Reply #25 on: January 28, 2016, 08:58:39 PM »
This is how I'm doing mine, Tom is a wealth of info and help and answers the phone. http://www.performanceboats.com/jet-boat-performance/251682-sleekcraft-stringer-project.html
  • Boat #1: 79 Taylor of california
  • Like
    Dislike
    Love
    HaHa
    Angry
    Surprise
    Sad
    Party
I identify as Hansom, Intelligent, and charismatic so I expect to be treated as such!

eastcoastboys

  • Karma: +0/-0
Re: Sleekcraft SST Tunnel Project.
« Reply #26 on: January 29, 2016, 07:23:51 AM »

This is how I'm doing mine, Tom is a wealth of info and help and answers the phone. http://www.performanceboats.com/jet-boat-performance/251682-sleekcraft-stringer-project.html

I like the wood dowle set up. But if you scroll back to the beginning of this post I was told putting the stringers on top of the floor would be a bad idea and that the motor would eventually rip the ply woods apart layer by layer. I really can't see how so when I was planning on encasing the whole thing with woven heavy fiber. How has this set up worked for you and have you run it yet and how much hp?


Sent from my iPhone using SoCal Jet Boats
  • Like
    Dislike
    Love
    HaHa
    Angry
    Surprise
    Sad
    Party

tunnels

  • Karma: +13/-0
Re: Sleekcraft SST Tunnel Project.
« Reply #27 on: January 29, 2016, 08:14:01 AM »
I am finally getting all the material together to do this. Hp will be in the 500 to 600 range. Call Tom and talk with him. They have done quite a few this way. I think the strength comes from the whole process start to finish. I looked at a lot of ways people where fixing this problem and this seamed like the best solution. I'll know this summer!
  • Boat #1: 79 Taylor of california
  • Like
    Dislike
    Love
    HaHa
    Angry
    Surprise
    Sad
    Party
I identify as Hansom, Intelligent, and charismatic so I expect to be treated as such!

tunnels

  • Karma: +13/-0
Re: Sleekcraft SST Tunnel Project.
« Reply #28 on: February 14, 2016, 08:57:50 AM »
Any progress to report, pictures?
  • Boat #1: 79 Taylor of california
  • Like
    Dislike
    Love
    HaHa
    Angry
    Surprise
    Sad
    Party
I identify as Hansom, Intelligent, and charismatic so I expect to be treated as such!

eastcoastboys

  • Karma: +0/-0
Re: Sleekcraft SST Tunnel Project.
« Reply #29 on: February 14, 2016, 01:50:33 PM »
Next weekend. Boats been on hold for a few weeks with vacation time and business trips. Pictures to come next weekend hopefully of completed glass work so we can move on to building a back seat


Sent from my iPhone using SoCal Jet Boats
  • Like
    Dislike
    Love
    HaHa
    Angry
    Surprise
    Sad
    Party

eastcoastboys

  • Karma: +0/-0
Re: Sleekcraft SST Tunnel Project.
« Reply #30 on: February 21, 2016, 09:17:18 AM »
And here starts the fiberglass work. And it's 60 degrees out here in New England year of the jetboat.


Sent from my iPhone using SoCal Jet Boats
  • Like
    Dislike
    Love
    HaHa
    Angry
    Surprise
    Sad
    Party

eastcoastboys

  • Karma: +0/-0
Re: Sleekcraft SST Tunnel Project.
« Reply #31 on: February 21, 2016, 02:41:08 PM »
Couple more. Waiting for the cure and out goes the brace and another layer to be laid some night after work.


Sent from my iPhone using SoCal Jet Boats
  • Like
    Dislike
    Love
    HaHa
    Angry
    Surprise
    Sad
    Party

eastcoastboys

  • Karma: +0/-0
Re: Sleekcraft SST Tunnel Project.
« Reply #32 on: February 25, 2016, 02:26:12 PM »
Looking for opinions here. So far I have two layers of woven 18 oz fiberglass laid down so far. The glass doesn't go up and over the stringers yet. The floor boards are gonna run along the out sides of the stringers and I was planning on running two layers of the woven in one piece all the way up and over the stringer and down into the bilge like what I have already done. My question is is this enough or should I run another layer up and over before the floor?  Planning one using chop strain one the nose and the transom before the floor. Already have a couple layers of woven on the transom. 500+ hp 454 is going in. 


Sent from my iPhone using SoCal Jet Boats
  • Like
    Dislike
    Love
    HaHa
    Angry
    Surprise
    Sad
    Party

eastcoastboys

  • Karma: +0/-0
Re: Sleekcraft SST Tunnel Project.
« Reply #33 on: March 04, 2016, 03:04:17 AM »
Anyone want to chime in on this?  The fiberglass work has been going smooth and I have good faith in my self but a opinion from someone that knows alittle more than me would help me sleep at night.


Sent from my iPhone using SoCal Jet Boats
  • Like
    Dislike
    Love
    HaHa
    Angry
    Surprise
    Sad
    Party

eastcoastboys

  • Karma: +0/-0
Re: Sleekcraft SST Tunnel Project.
« Reply #34 on: March 25, 2016, 04:47:46 PM »
Well the motor had been painted. And the fiberglass work is in the home stretch. Soon we should be moving on to something more enjoyable. Lots of parts are flowing in from the mail. Can't wait to start the rigging and wiring more pictures to come. 


Sent from my iPhone using SoCal Jet Boats
  • Like
    Dislike
    Love
    HaHa
    Angry
    Surprise
    Sad
    Party

eastcoastboys

  • Karma: +0/-0
Re: Sleekcraft SST Tunnel Project.
« Reply #35 on: April 09, 2016, 12:25:29 PM »
Today is rebuilding the front seats and yesterday was the second to last layer of fiberglass on the stringers. It's coming to a end next the motor mounts and block to be set in so the back seat can be built. And I shall never think of doing a project with fiberglass work ever again.


Sent from my iPhone using SoCal Jet Boats
  • Like
    Dislike
    Love
    HaHa
    Angry
    Surprise
    Sad
    Party

Flusher

  • Karma: +84/-0
Re: Sleekcraft SST Tunnel Project.
« Reply #36 on: April 09, 2016, 01:40:22 PM »
Looks like the stringers came out really good
  • Like
    Dislike
    Love
    HaHa
    Angry
    Surprise
    Sad
    Party
"I want to roll with my brother Joe" - Joe Bateman - January 29, 1950 ~ November 27, 2013

eastcoastboys

  • Karma: +0/-0
Re: Sleekcraft SST Tunnel Project.
« Reply #37 on: April 09, 2016, 01:45:59 PM »

Looks like the stringers came out really good

One more layer and I am calling it lol. I got the resin and fiberglass figure one more for good luck.


Sent from my iPhone using SoCal Jet Boats
  • Like
    Dislike
    Love
    HaHa
    Angry
    Surprise
    Sad
    Party

eastcoastboys

  • Karma: +0/-0
Re: Sleekcraft SST Tunnel Project.
« Reply #38 on: April 21, 2016, 04:56:43 PM »
Well shit doesn't line up. And it's back to the drawing board. Anyone have any luck using a hoist leveler and trying to figure out where to mount the rails? 


Sent from my iPhone using SoCal Jet Boats
  • Like
    Dislike
    Love
    HaHa
    Angry
    Surprise
    Sad
    Party

Flusher

  • Karma: +84/-0
Re: Sleekcraft SST Tunnel Project.
« Reply #39 on: April 21, 2016, 05:48:54 PM »
Try to center the chain, biased slightly towards the front of the block with a ratchet strap to the rear of the block, creating 3 points of contact
  • Like
    Dislike
    Love
    HaHa
    Angry
    Surprise
    Sad
    Party
"I want to roll with my brother Joe" - Joe Bateman - January 29, 1950 ~ November 27, 2013

eastcoastboys

  • Karma: +0/-0
Re: Sleekcraft SST Tunnel Project.
« Reply #40 on: May 30, 2016, 09:36:28 AM »
No work has been taking place on this boat lately trying to finish up the big boat this past couple weeks and then back to the jet boat. Gonna try and make a alignment tool that goes into the pump and bolts to the motor. And use that and the cool four point engine lift thingy i got lone to me. We will get it one way or another. But that's for the idea I might use a strap or two to keep the motor in place while we mark hole


Sent from my iPhone using SoCal Jet Boats
  • Like
    Dislike
    Love
    HaHa
    Angry
    Surprise
    Sad
    Party

 


Null

SMFPacks CMS 1.0.3 © 2026