Things to do.
1. Modify my transom support as the crank pulley is too close to change the fan belt.

I'm confused .
2. I found a soft spot in the floor, repair floor.
Worry about that later ! My Saguaro has some too !
3. Mount the battery mount, water fuel seperator, fuel valve.
4. Hook-up the water to the engine.
5. I need to wire it.
How much wiring really needs to be done .
6. Gas tanks need to be installed.
7. Exhaust outlets need to be repaired (missing flapper doors) and reinstalled.
8. Exhaust outlets are 3 1/2" and the snails outlets are 2 3/4".
3 1/2 hose will fit around the entire snail . Mines like that .
9. The engine's aluminum needs to be cleaned and the engine needs a little bit of touch-up paint.
Save it for later !
10. Install logs, snails, valve covers.
11. Check/replace cables.
Debatable .
12. Modify and strengthen the seats (longer engine than what it had in it before).
You should have that done in a jiffy ( yes I said jiffy )
13. Shorten the rear seat cushions (about 3 inches).
Later dude .
14. Make gas tank covers.
Not gonna stop you from running or floatin
15. Carpet.
Debatable
16. Install rub rail.
Debatable.
17. Paint touchups.
You are not going to have the ugliest boat there , guaranteed !
18. Jacuzzi WJ transom cover plugs (different than Bekeley's plugs).
19. Paint the trailer.
Debatable.
20. Pinstripe boat and trailer.
Are you kidding .
That's the plan. In 11 days I'm going to the river, I got a feeling the Miller isn't going. It has to be done for the AVI trip, July 13th, which is in 19 days.
If anyone wants to lend a hand, I'll pay for your drink(s) and your gas, I'll even feed you while your here. I got a friend helping me out with some of it... Any takers?

Cut the fukin list in half . Get the essentials done first and everything else is secondary.
My .02
-beerjet-